|
|
photo below: A catch basin hole for new (rcp) pipe to enter catch basin,
hole was a 24" in diameter to except a 20" pipe
drilling was tight but project was complete and customer happy!

below -scoring new expansion joints at a school site ,
these joints had no room for error
(not with the inspector watching-
the entire time!!)

|
|
|